Cladding a concrete stair
- Difficulty:
- Moderate
- Duration:
- 3 to 5 days, after 48 hours of acclimatising
- Questions:
- 18
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 18 steps

A bare concrete stair becomes warm and quiet with wooden treads and risers. The work is in the preparation: the concrete has to be firm, dry and flat, every step is measured on its own and every wooden tread sits in the adhesive over its whole surface.
We ask about your stair, the condition of the concrete and your choice of wood and work everything out: treads with spares, riser boards, adhesive, repair mortar where needed, oil or lacquer and all the tools. Your step-by-step plan runs from measuring to the first week of use. With cracks, damp, tiles or suspected asbestos, we tell you what has to happen first.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorRenovating a stairRenewing a worn wooden stair with overlay treads, or by sanding and lacquering, oiling or painting it again, with a new handrail if you like.Moderate18 questions2 to 4 days, plus drying timeView this job
3D configuratorInstalling a wooden staircaseInstalling a new wooden kit stair in an existing stairwell: measuring, ordering, assembling, fixing and finishing.Demanding20 questions2 to 3 days, plus drying time for the finishView this job
3D configuratorPainting interior woodworkLacquering interior doors, door frames, skirting and windows on the inside: degreasing, sanding, filling, primer and two coats of lacquer.Moderate18 questions2 to 4 days, because of the drying time between coatsView this job
3D configuratorLaying parquet flooringEngineered parquet, floating on an underlay or glued to the screed, with oiling or lacquering when the boards are unfinished.Moderate18 questions2 to 3 days, after 48 hours of acclimatisingView this job