Installing a wooden staircase
- Difficulty:
- Demanding
- Duration:
- 2 to 3 days, plus drying time for the finish
- Questions:
- 20
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 20 steps

You can place a kit stair in pine, rubberwood, beech or oak yourself, with two helpers. You measure the floor height and the stairwell, choose a straight or a quarter-turn stair, shorten the stringers, assemble the stair and fix it to the floor and wall. Then come the balustrade, the handrail and the finish.
Making a new or larger stairwell is work on the load-bearing structure and is not part of this job. Covering an existing stair is done with the job Renovating a staircase.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorRenovating a stairRenewing a worn wooden stair with overlay treads, or by sanding and lacquering, oiling or painting it again, with a new handrail if you like.Moderate18 questions2 to 4 days, plus drying timeView this job
3D configuratorPainting interior woodworkLacquering interior doors, door frames, skirting and windows on the inside: degreasing, sanding, filling, primer and two coats of lacquer.Moderate18 questions2 to 4 days, because of the drying time between coatsView this job
3D configuratorBuilding a partition wallA non-load-bearing interior wall of metal profiles and plasterboard, with insulation against sound.Moderate15 questions2 to 3 days, plus drying time for the jointsView this job
3D configuratorRenting a waste containerChoose a container, big bags or the trailer for your construction waste, with the right size, the permit for the street and what may not go in.Easy16 questionsHalf a day to arrange, plus the days you loadView this job