Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.
Insulating a pitched roof from the inside
- Difficulty:
- Moderate
- Duration:
- 1 to 2 weekends
- Questions:
- 17
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 15 steps

An insulated roof is the biggest energy saving in a home, and you can do it yourself. We ask about your sub-roof, your rafters and any insulation already there, and work out which insulation you need and how thick. You also get everything to finish the vapour barrier airtight: that is where DIY jobs most often go wrong.
First we check that your roof is ready for it. With a leak, affected timber, no sub-roof or suspected asbestos, we tell you what has to happen first.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorInsulating the attic floorInsulation on or in the floor of an unheated attic: the cheapest way to stop heat loss through the roof.Easy14 questions1 day to 1 weekendView this job
3D configuratorFitting a roof windowA roof window in a pitched roof with tiles or slates: between the rafters or with one trimmed rafter, with flashing, collars and the lining inside.Demanding14 questions1 to 2 days per window, including one dry day with the roof openView this job
3D configuratorInsulating an outside wall on the insideInsulating an outside wall on the inside with a stud lining of profiles, wool and a vapour barrier, or with glued insulation boards. With the damp checks that decide whether it may be done.Moderate19 questions2 to 4 days for one wall, not counting the jointingView this job
3D configuratorJointing and filling plasterboardFinish fitted plasterboard until it is ready to paint, paper or tile: tape, fill coats, corners, sanding and primer.Moderate16 questions3 to 10 days, mostly because of drying timesView this job