Building a timber deck
- Difficulty:
- Moderate
- Duration:
- 2 to 5 days, longer on soil
- Questions:
- 15
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 17 steps

A timber deck is more than boards: underneath lies a grid of joists on supports, which has to stay dry and slope slightly. How close the joists lie depends on the kind of board and its thickness.
We ask about the size, the base and your boards and work everything out: boards, joists, pedestals or pavers, screws or clips, and the tools. We also tell you when you need a permit in Flanders and what to watch out for against the house wall. A raised deck or a deck on a flat roof is outside this job.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorDigging and excavatingDigging by hand or with a hired mini digger for a new floor build-up, a trench or an area outside, safely and by the rules.Moderate16 questions1 to 3 days, after waiting 3 working days for the KLIP plansView this job
3D configuratorPutting up a garden fencePutting up timber or composite garden screens or wire mesh panels, with posts in concrete or on a concrete base.Moderate15 questions1 to 3 days, depending on the lengthView this job
3D configuratorFitting a terrace canopyAn open canopy from a kit against your house, in aluminium or timber: permit, footings, wall profile, posts, roof and gutter.Demanding17 questions2 to 3 days, plus a week for the concreteView this job
3D configuratorPlacing a garden shedA wooden garden shed from a kit: the permit rules, the base, the assembly, the roof covering and the stain.Moderate18 questions2 to 4 days, plus drying time of the stainView this job