Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.
Fitting a terrace canopy
- Difficulty:
- Demanding
- Duration:
- 2 to 3 days, plus a week for the concrete
- Questions:
- 17
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 17 steps

With a canopy you can sit outside even when it rains. You put up a kit with two or three people in a few days, plus the waiting time for the concrete of the footings.
You need a planning permit first, and the wall must be able to carry the wall profile. A closed, heated veranda and a wall with external insulation are work for a professional.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorBuilding a timber deckA low garden deck of timber or composite on joists, on existing paving or on soil.Moderate15 questions2 to 5 days, longer on soilView this job
3D configuratorPulling electrical circuitsNew circuits from the consumer unit to every socket, light point and appliance: chases, flush boxes, conduit and wire, and the diagrams for the inspection.Demanding15 questions2 to 5 days, depending on the number of pointsView this job
3D configuratorDigging and excavatingDigging by hand or with a hired mini digger for a new floor build-up, a trench or an area outside, safely and by the rules.Moderate16 questions1 to 3 days, after waiting 3 working days for the KLIP plansView this job
3D configuratorPlacing a garden shedA wooden garden shed from a kit: the permit rules, the base, the assembly, the roof covering and the stain.Moderate18 questions2 to 4 days, plus drying time of the stainView this job