Building a partition wall

Difficulty:
Moderate
Duration:
2 to 3 days, plus drying time for the joints
Questions:
15
3D configurator:
you see your job in 3D with every question
Step-by-step plan:
17 steps

With a wall of metal profiles and plasterboard you turn one room into two, without bricklaying. You fix profiles to floor and ceiling, place uprights between them, screw plasterboards onto them and fill the wall with mineral wool against sound.

We ask about the sizes, the doors, the floor and the ceiling and work everything out: profiles, boards, insulation, the right screws and plugs, joint tape and filler, and all the tools. With underfloor heating we count adhesive instead of plugs. If the wall has to carry something or stands between two dwellings, we tell you this is a job for a professional.