Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.
Fitting or renewing a consumer unit
- Difficulty:
- Demanding
- Duration:
- 1 day of preparation, half a day to a full day for the changeover, plus the inspection
- Questions:
- 19
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 16 steps

Replacing an old fuse board is work where you cannot afford a mistake. First you map every circuit, draw the layout following the AREI and assemble the new board on the table, while the old one still works. If you can switch off the supply safely yourself, you also do the changeover. Otherwise an electrician does that part.
We ask about your current board, your supply, your earth and your circuits, and work out how many residual current devices and breakers you need and how large the enclosure must be. You get a step-by-step plan up to the inspection by an accredited body. With scorch marks, a poor earth, a three-phase board or suspected asbestos, we tell you what has to happen first.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorPulling electrical circuitsNew circuits from the consumer unit to every socket, light point and appliance: chases, flush boxes, conduit and wire, and the diagrams for the inspection.Demanding15 questions2 to 5 days, depending on the number of pointsView this job
3D configuratorPreparing for the electrical inspection (AREI)Get your electrical installation ready for the inspection: diagrams, labels, a self-check, booking and what to do with the report.Easy17 questionsHalf a day to a day of preparation, plus the visitView this job
Connecting sockets, switches and light pointsSafely connecting sockets, switches, two-way circuits, lamps and an outdoor lamp with a motion sensor to cables that are already in place.Moderate18 questionsHalf a day to a full dayView this job
3D configuratorFitting an electric water heaterHanging an electric water heater of 50 to 200 l, with safety group, water connection and a safe electrical connection on its own circuit.Moderate16 questionsOne day, plus 2 to 5 hours of heating upView this job