Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.
Connecting sockets, switches and light points
- Difficulty:
- Moderate
- Duration:
- Half a day to a full day
- Questions:
- 18
- Step-by-step plan:
- 15 steps

Replacing a socket or switch is a small job, as long as you do it safely: the right circuit off, measuring yourself that there is no voltage, and every wire on the right terminal. In a bathroom, outdoors and in damp rooms stricter rules apply.
We ask what you connect and what your installation looks like, and work out the devices, connectors, plugs and tools. Then you get a step-by-step plan from finding the breaker to testing every point. If your installation is not safe enough, or a cable has to be pulled first, we tell you what has to happen first.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorPulling electrical circuitsNew circuits from the consumer unit to every socket, light point and appliance: chases, flush boxes, conduit and wire, and the diagrams for the inspection.Demanding15 questions2 to 5 days, depending on the number of pointsView this job
3D configuratorFitting or renewing a consumer unitA new single-phase consumer unit with a main residual current device, 30 mA devices and breakers, following the AREI and ready for inspection.Demanding19 questions1 day of preparation, half a day to a full day for the changeover, plus the inspectionView this job
3D configuratorPreparing for the electrical inspection (AREI)Get your electrical installation ready for the inspection: diagrams, labels, a self-check, booking and what to do with the report.Easy17 questionsHalf a day to a day of preparation, plus the visitView this job
3D configuratorInstalling LED lightingLED strips in an aluminium profile, recessed spots in the ceiling and a dimmer that matches them.Moderate22 questionsHalf a day to a full dayView this job