Pulling electrical circuits

Difficulty:
Demanding
Duration:
2 to 5 days, depending on the number of points
Questions:
15
3D configurator:
you see your job in 3D with every question
Step-by-step plan:
16 steps

You plan your points and circuits, chase grooves or work in a hollow wall or surface-mounted, set the boxes and lay pre-wired conduit with the right wire size to every point. You also draw the single-line diagram and the position plan the inspector asks for.

Connecting sockets, switches and lamps, the consumer unit and the inspection itself are separate jobs. A new installation or an important extension must always be inspected before you use it.

Often combined with

Jobs that usually come just before or after this one.