Tiling a bathroom wall
- Difficulty:
- Moderate
- Duration:
- 2 to 4 days, plus drying time
- Questions:
- 15
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 16 steps

Tiling a bathroom wall starts with the wall itself: it has to be dry, sound and flat, and not every substrate tolerates water or heavy tiles. Where the shower or bath splashes the wall, a waterproofing layer with band in the corners belongs under the tiles.
We ask about your walls, your substrate and your tiles and work everything out: from primer and adhesive to tile trims and silicone, and all the tools. With damp, loose plaster, standard plasterboard in the shower or suspected asbestos, we tell you what has to happen first.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorTiling a bathroom floorCeramic tiles on screed, existing tiles or timber, with the right preparation and waterproofing.Moderate17 questions2 to 4 days, plus drying timeView this job
3D configuratorFitting a walk-in showerA shower level with the floor: sloped board or flat tray, the drain, a watertight shower zone and the glass screen.Demanding19 questions3 to 5 working days, spread over 2 weeks because of the drying timesView this job
3D configuratorPlastering walls and ceilingsGypsum plaster by hand on brick, block or concrete, or repairing and smoothing old plaster: primer, rails, corner beads, ruling off and smoothing.Demanding18 questions1 to 3 days, plus 3 to 4 weeks of drying timeView this job
3D configuratorFitting a washbasin or vanity unitA wall-hung or floor-standing vanity unit or a basin on its own, with tap, trap and mirror, on existing supply points.Moderate17 questionsHalf a day, plus 24 hours of drying timeView this job