Skip to content
BouwMaat

Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.

Fitting a walk-in shower

Difficulty:
Demanding
Duration:
3 to 5 working days, spread over 2 weeks because of the drying times
Questions:
19
3D configurator:
you see your job in 3D with every question
Step-by-step plan:
16 steps

A walk-in shower looks simple, but everything that matters is under the tiles: a drain that fits in the height you have, a floor with a 1.5% fall and waterproofing without a single weak spot. Tiles and joints are not watertight by themselves.

We ask about your shower zone, your floor, your drain point and your walls, and work out what you need: the sloped board or tray, the drain and the fittings, mortar, primer, waterproofing, band and the glass screen. Then you get a step-by-step plan in the order a professional works, with the drying times. If there is too little height, underfloor heating is in the way, the floor is timber or there is no drain point, we tell you honestly what has to happen first. The tiling itself is in the jobs Tiling a wall and Tiling a bathroom floor.

Often combined with

Jobs that usually come just before or after this one.