Pouring a concrete floor
- Difficulty:
- Demanding
- Duration:
- 2 to 3 days of work, plus 4 weeks of curing
- Questions:
- 15
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 16 steps

A concrete floor on the ground is the base under a garden shed, a garage or the floor build-up of your house. You lay a compacted base layer, film and a reinforcing mesh, set formwork or guide rails at height and pour the slab in one go.
The pour itself is work against the clock, with helpers. This plan tells you what to order from the concrete plant, how to get the slab flat and how to protect the concrete during the first days. A floor that spans or carries a building is work for an engineer.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorDigging and excavatingDigging by hand or with a hired mini digger for a new floor build-up, a trench or an area outside, safely and by the rules.Moderate16 questions1 to 3 days, after waiting 3 working days for the KLIP plansView this job
3D configuratorBreaking out a floorBreaking out tiles, screed and a concrete floor on the ground yourself: safe for asbestos, pipes and dust, with the right demolition hammer and a plan for the rubble.Demanding17 questions2 to 4 days for 20 m²View this job
3D configuratorInsulating a floorInsulation boards in PIR or XPS on the slab, under the screed: with film, edge insulation, room for pipes and a build-up that fits your height.Moderate15 questions1 to 2 days for 20 m², not counting the screedView this job
3D configuratorLaying a screedA traditional cement screed, bonded, on film or floating on insulation: edge strip, mesh, rails, mixing, laying and drying.Demanding19 questions1 to 2 days of work, plus at least 4 weeks of dryingView this job
3D configuratorPlacing a garden shedA wooden garden shed from a kit: the permit rules, the base, the assembly, the roof covering and the stain.Moderate18 questions2 to 4 days, plus drying time of the stainView this job