Skip to content
BouwMaat

Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.

Laying a screed

Difficulty:
Demanding
Duration:
1 to 2 days of work, plus at least 4 weeks of drying
Questions:
19
3D configurator:
you see your job in 3D with every question
Step-by-step plan:
18 steps

The screed is the flat layer between the bare floor and your floor covering. You can lay a traditional, earth-moist cement screed yourself, but it is heavy work that has to be finished in one day: 10 m² at 5 cm is already a tonne of mortar. The build-up has to be right, because a screed that is too thin or is stuck to the walls will crack.

We ask about your substrate, the build-up and the thickness and work everything out: mortar or sand and cement, edge strip, film, reinforcement mesh and the tools. Then you get a step-by-step plan from marking the level to the drying time for your floor covering. A poured screed, a timber floor or a floor that may not carry the weight: then we tell you honestly who you need.

Often combined with

Jobs that usually come just before or after this one.