Insulating a floor
- Difficulty:
- Moderate
- Duration:
- 1 to 2 days for 20 m², not counting the screed
- Questions:
- 15
- 3D configurator:
- you see your job in 3D with every question
- Step-by-step plan:
- 19 steps

You insulate a floor only once: as soon as the screed is on, you cannot get at it any more. That is why everything starts with the height. Insulation, screed and floor covering together have to fit under your doors and against your stairs, and pipes on the floor take up room too.
We ask about your floor, your pipes and the height you have, and work out how thick you can insulate. You get the boards, film, edge insulation and tape in the right amounts, and a step-by-step plan from the floor level to the film the screed goes on. If you choose sprayed PUR, you read what you prepare yourself, what you ask the installer and what you check afterwards. With damp, asbestos or too little height, we tell you what has to happen first.
Often combined with
Jobs that usually come just before or after this one.
3D configuratorLaying a screedA traditional cement screed, bonded, on film or floating on insulation: edge strip, mesh, rails, mixing, laying and drying.Demanding19 questions1 to 2 days of work, plus at least 4 weeks of dryingView this job
3D configuratorLaying underfloor heatingWater underfloor heating in a new screed: edge strip, stud panels or tacker system, the pipes in a snail pattern, the manifold and the pressure test.Demanding18 questions1 to 2 days of laying, 24 hours of pressure testing; then the screed and at least 28 days of waitingView this job
3D configuratorBreaking out a floorBreaking out tiles, screed and a concrete floor on the ground yourself: safe for asbestos, pipes and dust, with the right demolition hammer and a plan for the rubble.Demanding17 questions2 to 4 days for 20 m²View this job
3D configuratorPouring a concrete floorA concrete slab on the ground, indoors on the ground floor or outdoors for a shed or garage: base layer, film, reinforcement, ordering concrete, pouring and curing.Demanding15 questions2 to 3 days of work, plus 4 weeks of curingView this job
3D configuratorTiling a floor (living space)Laying tiles in a living room, kitchen or hall: setting the floor out, laying large tiles flat, movement joints and tiling on underfloor heating.Demanding19 questions3 to 5 days, plus drying timeView this job