Laying water supply pipes

Difficulty:
Demanding
Duration:
2 to 4 days, plus drying time
Questions:
18
3D configurator:
you see your job in 3D with every question
Step-by-step plan:
18 steps

With multilayer pipe and press fittings you can lay a neat water installation yourself: every tap gets its own pipe from a manifold, so there are no joints in the wall. Before the walls are closed, you prove with a pressure test that everything is tight.

We ask about your tap points, your current installation and the route and work everything out: pipe with sleeve or insulation, manifolds, wall plates, the connector and all the tools. You get a step-by-step plan from the pipe plan to flushing. With asbestos, lead, a missing check valve or a mandatory inspection, we tell you what has to happen first and what a professional does.

Often combined with

Jobs that usually come just before or after this one.