Laying laminate flooring

Difficulty:
Easy
Duration:
1 to 2 days, after 48 hours of acclimatising
Questions:
15
3D configurator:
you see your job in 3D with every question
Step-by-step plan:
18 steps

Laying laminate is one of the easiest jobs, as long as the preparation is right. The substrate has to be dry and flat, screed and tiles need a vapour-control film, and the laminate must be able to expand by 8 to 10 mm everywhere.

We ask about your room and your substrate and work everything out: laminate with cutting loss, film, underlay, skirting, profiles for the doorways and all the tools. Then you get a step-by-step plan that fits your floor, from acclimatising to the skirting. With damp, a floor that is too uneven or suspected asbestos in old vinyl, we tell you what has to happen first.