Skip to content
BouwMaat

Please note: this questionnaire has not yet been checked by a professional. Treat the outcome as an example only.

Laying vinyl flooring

Difficulty:
Moderate
Duration:
1 to 3 days, after 48 hours of acclimatising
Questions:
20
3D configurator:
you see your job in 3D with every question
Step-by-step plan:
21 steps

Vinyl is thin, water resistant and quiet, which makes it popular in kitchens, bathrooms and renovations. Click vinyl is laid floating and is quite doable for a beginner. Glue-down vinyl is fully glued to a levelled floor: that takes more preparation and a steady hand. In both cases the result stands or falls with the substrate, because vinyl shows every irregularity.

We ask about your room, your vinyl and your substrate and work everything out: vinyl with cutting loss, underlay or adhesive, primer and levelling compound, skirting, profiles and all the tools. Then you get a step-by-step plan that fits your floor, from acclimatising to finishing. With damp, an unsuitable substrate, a shower floor or suspected asbestos in old vinyl, we tell you what has to happen first.

Often combined with

Jobs that usually come just before or after this one.